D012
Key words:
Xinheyue
Classification:
Product Details
Solar Spike Instructions
ModelXHY-D012
- Configuration
Picture |
Technical parameters |
Description |
|
1.Power supply: solar cells (monocrystalline silicon)2.5V/120MA 2.Energy storage device: Ni-MH rechargeable battery1.2V/600MAH NI-MHHigh temperature battery 3.Working hours: under normal light intensity, one time8HContinuous support72H 4.Aluminum alloy shell compressive ability, static pressure>10tons 5.Display device: φ5super bright anti-fogLED, can be customizedLEDLamp bead color 6.Working mode: flashing (2Hz±20%) or 7.Start-up control light intensity: front light is less500Lux 8.Visual distance:>500Meters 9.Service life: effective use>3Year 10.Working environment:-20℃ ~ 60℃ 11.Specifications:107*95*23mm; 12Inner box:135*125*50MM Two boxes |
1. color: Red and yellow basket green and white flashing or always bright (optional)
|
2. packaging
Model |
Outer box size (m) |
Quantity (Pcs) |
Net weight (Kg) |
Gross weight (Kg) |
Material |
Volume (m3) |
CDN-D012 |
400*275*280MM |
60 |
17.1 |
18.5 |
K = K |
0.0308 |
3. Packing List
Name |
Solar Spike |
Inner packing box |
Instructions |
Certificate |
Quantity |
60 |
30 |
1 |
1 |
4. installation
Side of the road (not recommended to install in the middle of the road, to avoid excessive impact of the car, resulting in damage to the spike) |
|
1Positioning: |
First, use a ruler to determine the installation position to ensure that each position is in a straight line longitudinally. The installation distance shall be subject to the design requirements. The installation place shall be flat, dry, clean and seamless. |
|
Special spikeA glue, spike special B glue, A glue B glue ratio is 1:1 (such as: A glue 1kg, B glue is 1kg). Glue must be stirred evenly, consistent color. |
|
During installation, the road surface should be cleaned and the glue should be moderate. The bottom surface of the spike should be glued firmly without overflowing too much. About each spike needs to be used.40-50 grams of glue, glue on the bottom of the road signs, on the pre-marked position. After installation to clean up the road debris. |
5Inspection: |
After two hours, the installed spike should be checked again. |
6Road closure: |
Proposed road closure6 hours to ensure the curing time of the glue. |
5. renderings
Individual regional installation renderings |
|
|
|
|
|
Related Products
Product inquiry